Boathouse Steel Ridge Beam Erection & Installation

Posted April 27, 2026

Dockside Welding

Built by Dockside Welding

01 · ABOUT THIS PROJECT

We prefabricated and installed a heavy W18x87 structural steel ridge beam for a waterfront boathouse project. After design changes replaced the original LVL beam with a 3,000+ lb steel I-beam, we mobilized quickly to keep construction on schedule. We pre-welded and fabricated the components at our shop yard while preparing the dock site. With barging and crane assistance, we hoisted the massive beam onto steel columns and completed the field welding directly over the water. Through careful planning and prefabrication, the crane barge operation took just 45 minutes on install day.

SCOPE AND TRADES ON THIS BUILD
Welding
Structural Steel
Barging
Steel Erection
02 · PHOTOS
Large steel I-beam loaded on a flatbed trailer in a gravel yard with a dog sitting nearby.
View from scaffolding overlooking a crane truck on a barge delivering a steel beam to a dock frame.
Worker on scaffolding welding a structural steel beam suspended high overhead by a barge crane.
Welder working from multi-tier scaffolding to secure a steel I-beam atop support columns on a dock.
Tugboat pushing a flatdeck barge carrying a crane truck across an open lake toward the shoreline.

Created: Apr 27, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

April 27, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →

More from this crew

Other work by the people who built this

See all →