PROJECT

READY

Custom Steel Dock Construction at Touchstone Resort

Posted March 25, 2026

Dockside Welding

Built by Dockside Welding

01 · ABOUT THIS PROJECT

We constructed a heavy-duty structural steel dock for boat parking and passenger mooring at Touchstone Resort. Using our welded steel frame construction methods, we built a sturdy waterfront dock system designed to handle everyday marine traffic and large commercial vessels. Shortly after completion, the Wenonah II cruise boat tied up alongside the dock to pick up guests. The captain commended our crew on how solid and sturdy the structure remained while mooring such a massive vessel.

SCOPE AND TRADES ON THIS BUILD
Welding
Structural Steel
02 · PHOTOS
Large cruise ship Wenonah II moored alongside a newly constructed dock with passengers boarding.
Stern view of cruise ship tied to the dock, with steel and timber dock framing visible in the foreground.
Structural steel dock frame installed over the water with pier finger layout before full decking.

Created: Mar 25, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

March 25, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →

More from this crew

Other work by the people who built this

See all →