PROJECT
READYPosted March 26, 2026
Built by Rieger Contracting
Built by
Rieger ContractingWe constructed pickerel spawning beds at the base of the Moon River falls on Georgian Bay for the Ministry of Natural Resources. Utilizing our 30×60 spud barge and a 16-ton excavator, we placed hundreds of tonnes of round boulders directly into the river current. Transporting the rock from our nearby private commercial landing, we created durable underwater beds tailored to natural spawning needs. The rounded boulders create essential gaps that allow clean, oxygenated water to flow over eggs while preventing silt buildup, giving pickerel an ideal environment to reproduce.






Created: Mar 26, 2026

Cheers to more pickerel! 🙌
Please sign in to comment on projects
Status
Ready
Posted
March 26, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Other work by the people who built this