PROJECT

READY

Pickerel Spawning Bed Construction on Moon River

Posted March 26, 2026

Rieger Contracting

Built by Rieger Contracting

01 · ABOUT THIS PROJECT

We constructed pickerel spawning beds at the base of the Moon River falls on Georgian Bay for the Ministry of Natural Resources. Utilizing our 30×60 spud barge and a 16-ton excavator, we placed hundreds of tonnes of round boulders directly into the river current. Transporting the rock from our nearby private commercial landing, we created durable underwater beds tailored to natural spawning needs. The rounded boulders create essential gaps that allow clean, oxygenated water to flow over eggs while preventing silt buildup, giving pickerel an ideal environment to reproduce.

SCOPE AND TRADES ON THIS BUILD
Barging
Excavation
02 · PHOTOS
Yellow excavator placing round boulders into flowing water along a rocky riverbed with a spotter watching nearby.
View from a spud barge looking toward an excavator and skid steer working in the river near a rocky shoreline.
Aerial view of the Moon River falls and rocky river bed showing newly placed boulder spawning beds in the dark water.
Yellow tracked excavator resting on a rocky riverbank with Moon River rapids flowing in the background.
Spud barge carrying a yellow excavator across open water toward rapids and rocky shoreline on Georgian Bay.
Excavator on a spud barge placing boulders into the Moon River to build spawning beds, with a tugboat alongside.

Created: Mar 26, 2026

03 · DISCUSSION
Profile
HummingbirdHill MuskokaMar 26, 2026

Cheers to more pickerel! 🙌

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

March 26, 2026

Crews credited

1

Likes

Comments