PROJECT

READY

Water Reservoir Soil Stripping in Bracebridge

Posted May 21, 2026

Rieger Contracting

Built by Rieger Contracting

01 · ABOUT THIS PROJECT

We completed soil stripping and site preparation over the water reservoir in Bracebridge to prepare for a new waterproof membrane. Working under strict 9-ton localized weight limits, our crew deployed a fleet of skid steers to carefully remove the overburden. To maximize efficiency, we brought in our compact screening plant to screen and reuse existing soil for backfill. We then brought in nutrient-dense topsoil for topdressing to finish the project and protect the town's clean drinking water.

02 · PHOTOS
Compact screening plant processing dirt piles alongside a skid steer loader under a blue sky.
Track loader loading excavated dirt into a portable screening plant hopper on a cleared jobsite.
Two compact track loaders stripping vegetation and clearing soil across an open construction area.
Blue compact screening machine positioned in tall grass next to a utility pole on site.
Large leveled dirt site cleared over the water reservoir with a dog resting near an excavator bucket.

Created: May 21, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

May 21, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

0

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing

3

0

closets

closets

David Dow
Posted by David Dow
Carpenter
Cabinet

1

0

Port Colbourne ADU

Port Colbourne ADU

Vedro Drywall
Posted by Vedro Drywall
#ResidentialInsulation
Drywall Boarding

3

0

More from this crew

Other work by the people who built this

See all →