PROJECT
READYPosted February 27, 2026
Built by Dockside Welding with 1 credited collaborator
We relocated a complete two-storey boathouse across Lake Muskoka, moving the entire structure across open water to its new shoreline location. Using our marine equipment, tugboats, and flotation barges, we safely transported the building from one end of the lake to the other. Marine construction on-site included positioning barge-mounted excavators, setting steel supports, and securing the substructure framing at the new waterfront site. Dockside Welding provides specialized marine transport, shoreline fabrication, and heavy barge services across the Muskoka lakes.








Created: Feb 27, 2026

Love seeing these builds.

What a rad process.

Amazing!
Please sign in to comment on projects
Status
Ready
Posted
February 27, 2026
Crews credited
2
Likes
Comments
Other work on Projekt Network
Front entrance staircase, Toronto — PT structure, full cedar finish
Toronto, ON
3
0
Other work by the people who built this