PROJECT
READYPosted September 15, 2025
Built by Farr Mechanical
Built by
Farr MechanicalWe completed a comprehensive mechanical system installation featuring a 10-ton vertical geothermal loop for heating, cooling, and hydronics. The design serves two fire-separated guest residences using dedicated water-to-air heat pumps alongside a water-to-water unit for in-floor hydronic heating. Our team managed full ductwork distribution with life-safety fire dampers, gas piping, refrigeration, an ERV fresh air system, and steam humidifiers. We also installed a backup boiler configured to power an automated hydronic snowmelt system across exterior walkways, parking pads, and stairs.






Created: Sep 15, 2025
Please sign in to comment on projects
Status
Ready
Posted
September 15, 2025
Crews credited
1
Likes
Comments
Other work on Projekt Network
Six Shooter Records: New Head Office
6
0
3 crews
Other work by the people who built this
New build on Lake Rosseau
Muskoka Lakes, ON
13
2
4 crews
South East Oakville
10
4
4 crews
Forest Hill Custom Home
9
3
4 crews