PROJECT
READYPosted May 23, 2026
Built by Anchor Construction
Built by
Anchor ConstructionWe designed and built this custom drop stair dock to solve steep water access challenges caused by a 15-foot seasonal river fluctuation. Low season makes reaching the water along the rocky granite shoreline difficult, so we engineered an adjustable wooden staircase and dock platform system. The stairs are raised with a winch for high-water season, secured with safety chains, and lowered during low water for easy river access. Built to withstand extreme conditions, the structure proved its durability when spring thaw waters rose right to platform level against raging river currents.



Created: May 23, 2026
Please sign in to comment on projects
Status
Ready
Posted
May 23, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Other work by the people who built this