Exhibition Pavilion Build, Metro Toronto Convention Centre

Posted March 10, 2026

New City Electric Inc.
KEVIN LEMAY
Mike MacFayden
Ian MacFayden

Built by Ian MacFayden with 3 credited collaborators

01 · ABOUT THIS PROJECT

We built this custom exhibition pavilion inside the Metro Toronto Convention Centre with a rapid four-day installation turnaround. To ensure seamless coordination on site, we panelized and prefabricated the structural components off-site before shipping them directly to the venue floor. Once delivered, our crew assembled the raised subfloor, framed the architectural walls, installed vertical timber slat features, and completed all detailed interior finishing before the final teardown.

SCOPE AND TRADES ON THIS BUILD
Speed
coordination
02 · WHO BUILT IT
Collaborator sections
Ian MacFayden
Speed
coordination
Ian MacFayden photo 1Ian MacFayden photo 2Ian MacFayden photo 3Ian MacFayden photo 4Ian MacFayden photo 5Ian MacFayden photo 6Ian MacFayden photo 7Ian MacFayden photo 8Ian MacFayden photo 9Ian MacFayden photo 10
Mike MacFayden
KEVIN LEMAY
New City Electric Inc.
03 · PHOTOS
Team members posing together in front of the completed modern wood slat pavilion at the convention centre.
Carpenters in safety vests fastening wood slat cladding to an interior wall structure.
Pavilion interior under construction showing a long island counter, drywalled partitions, and a laser level beam.
Workers assembling the exterior corner of a dark-clad pavilion booth with frosted glass wall panels.
Crew assembling vertical wood slat walls and ceiling framing on a raised platform in the convention hall.
Tradespeople installing ceiling panels and wall framing inside the temporary pavilion structure.
Carpenter on a stepladder securing decorative vertical timber slats to a partition wall.
Raised subfloor and vertical wood slat wall assemblies taking shape inside the convention space.
Blue telehandler lifting a prefabricated roof component into place on the convention floor.
Off-site prefabrication shop showing timber stud framing and engineered wood beams being pre-assembled.

Created: Mar 10, 2026

04 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

March 10, 2026

Crews credited

4

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Off-Grid Luxury Cottage Build on Georgian Bay

Off-Grid Luxury Cottage Build on Georgian Bay

Cam Fletcher
Posted by Cam Fletcher
Leadership
CARPENTER
coordination

2

5

Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

0

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing

3

0

closets

closets

David Dow
Posted by David Dow
Cabinet
Carpenter

1

0

More from this crew

Other work by the people who built this

See all →
Modern Custom Home Construction in Oakville

Modern Custom Home Construction in Oakville

HummingbirdHill Timber Solutions Inc.Ian MacFaydenTurkstraHummingbirdHill Homes
HummingbirdHill Homes + 3 collaborators

Oakville, ON

Construction Management
Project management
Budgeting & Cost Control

12

1

4 crews

Custom Waterfront Steel Railings in Muskoka

Custom Waterfront Steel Railings in Muskoka

Mike MacFaydenMitchell Manufacturing
Mitchell Manufacturing + 1 collaborator
Welding
Attention to Detail
High attention to detail

5

0

2 crews

Custom Steel Stair Handrails in Muskoka

Custom Steel Stair Handrails in Muskoka

Mike MacFaydenMitchell Manufacturing
Mitchell Manufacturing + 1 collaborator
Welding
Attention to Detail
High attention to detail

5

0

2 crews

Rowhouse Porch & Facade Makeover in Downtown Toronto

Rowhouse Porch & Facade Makeover in Downtown Toronto

Exterior Finish Carpentry
Stairs
Exterior trim

7

1

3 crews