PROJECT
READYPosted February 4, 2026
Built by Alexis Miller
Built by
Alexis MillerFor this full duplex renovation, I completed extensive structural, insulation, soundproofing, kitchen, and bathroom upgrades across both units. I replaced outdated insulation with R-30 closed-cell spray foam on the walls and R-60 on the ceilings, then installed Sonopan sound dampening and two layers of fire-retardant drywall between units. The flooring was upgraded with DRICORE subfloor and wood-look vinyl flooring, alongside full tile in the upper kitchen and both bathrooms. We also added two heat pumps to supplement the furnace, upgraded existing windows, added four new windows in the lower unit, and installed modern vanities, tiled showers, and complete kitchen cabinetry.









Created: Feb 4, 2026
Please sign in to comment on projects
Status
Ready
Posted
February 4, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
New build on Lake Rosseau
Muskoka Lakes, ON
13
2
4 crews
Other work by the people who built this