Pre-Apprenticeship Kitchen Build & Carpentry

Posted February 3, 2026

Lily O'Brien

Built by Lily O'Brien

01 · ABOUT THIS PROJECT

Built by

Lily O'Brien

As part of my pre-apprenticeship carpentry program, I collaborated on building a complete residential kitchen from framing to finishing. Our team handled every phase of residential construction, starting with rough timber framing, batt insulation, and vapor barrier installation. We hung and finished drywall, installed interior doors and window trim casing, and laid tile flooring. The build also included residential electrical rough-in, baseboard carpentry, and cabinet installation, giving me hands-on experience across comprehensive framing and finish carpentry.

SCOPE AND TRADES ON THIS BUILD
Framing
Teamwork
Door Installation
Drywall Installation
Flooring Installation
Window Installation
Cabinet
Painting
Drywall Finishing
Finish carpentry
Residential Electrical
Tile installation
02 · PHOTOS
Finished room view showing tile floor, painted walls, recessed ceiling lights, dark accent wall, and interior door.
Completed kitchen area with upper and lower cabinets, dark countertop, tiled floor, and an arched entryway.
Close-up of installed white baseboard molding along drywall and beige tiled floor near an electrical outlet.
Wall with two trimmed windows, electrical outlets, baseboard trim, and tile flooring next to kitchen base cabinets.
Installed double-hung window featuring painted wood casing, sill, and apron trim with wall electrical outlets below.
Drywalled room with taped and mudded joints and an arched doorway looking into an adjoining room under construction.
Installed drywall on kitchen walls with cutouts for windows, electrical outlet boxes, and framing openings.
Drywalled kitchen room and ceiling showing screwed drywall sheets, outlet openings, and doorway framing.
Carpenter installing a clear plastic vapor barrier over pink fiberglass batt insulation on framed stud walls.
Rough timber stud framing structure showing interior wall partitions, window rough openings, and door headers.

Created: Feb 3, 2026

03 · DISCUSSION
Profile
Kyle KellandFeb 6, 2026

Nice job Lily!

Profile
Ian MacFaydenFeb 5, 2026

Awesome work lily! Do you have anything lined up now that you’re done the pre-apprenticeship?

Profile
Alex CampbellFeb 3, 2026

Looks great Lily!

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

February 3, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Lake of Bays Custom Home Framing & Finishing

Lake of Bays Custom Home Framing & Finishing

Flooring Installation
Backframing
Framing

13

3

Custom Fireplace Mantle & Surround Build-Out

Custom Fireplace Mantle & Surround Build-Out

Matthew Allen
Posted by Matthew Allen
Painting
Drywall Boarding
Framing

5

0

Full Duplex Renovation: Kitchens, Baths & Insulation

Full Duplex Renovation: Kitchens, Baths & Insulation

Alexis Miller
Posted by Alexis Miller
Drywall Installation
Floor & wall tiling
Project management

9

0