PROJECT
READYPosted November 27, 2025
Built by Matthew Allen
Built by
Matthew AllenI completed this powder room remodel featuring a custom herringbone tile floor, new floating cabinetry, interior trim, and painting. To ensure long-lasting durability, I installed an uncoupling membrane beneath the marble-look herringbone tile before grouting the entire floor. I then measured, cut, and prepped new baseboards and quarter round trim to wrap the perimeter cleanly. The update was finished with freshly painted walls, a floating wood vanity with modern wall sconces, and a matching tall wall-mounted storage cabinet.






Created: Nov 27, 2025

@Ian MacFayden I think the shower install was definitely my favourite. I found it the most challenging because I had never done waterproofing like that before, and I had only a small bit of experience tiling, but stepping back at the end of the day to see it done? That felt very rewarding.

These are great @Matthew Allen! Well done getting all these projects up. Good show of experience. Which one was your favourite?
Please sign in to comment on projects
Status
Ready
Posted
November 27, 2025
Crews credited
1
Likes
Comments
Other work on Projekt Network
Other work by the people who built this
Virtual Builder Field Manual - Control Layer Continuity