Net-Zero Air Sealing for World Cup Facility, Toronto

Posted August 20, 2026

Aaron Waldt

Built by Aaron Waldt

01 · ABOUT THIS PROJECT

Built by

Aaron Waldt

I provided building envelope airtightness consulting and air sealing strategy for this net-zero training facility in Toronto. To meet strict sustainability targets, the exterior enclosure required an airtightness rating below 1.0 ACH. I collaborated directly with the architect to design robust air barrier details and worked onsite with the builder to inspect and troubleshoot penetrations, transitions, and continuous exterior insulation integration, ensuring a high-performance building envelope.

SCOPE AND TRADES ON THIS BUILD
Airsealing
02 · PHOTOS
Sheathing panel with blue self-adhesive air barrier membrane positioned against an insulated commercial wall assembly.
Conduit penetration through a blue exterior air barrier membrane sealed with specialized airtight sealant.
Long exterior facade showing blue air barrier membrane, horizontal metal rails, and rigid mineral wool insulation.

Created: Aug 20, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Location

Toronto, ON

Status

Ready

Posted

August 20, 2026

Crews credited

1

Likes

Comments

LOCATION

Toronto, ON

Exact addresses are never published. Projects show the municipality only.

More projects like this one

Other work on Projekt Network

See all →

More from this crew

Other work by the people who built this

See all →