PROJECT · TORONTO, ON
READYPosted August 20, 2026
Built by Aaron Waldt
Built by
Aaron WaldtI provided building envelope airtightness consulting and air sealing strategy for this net-zero training facility in Toronto. To meet strict sustainability targets, the exterior enclosure required an airtightness rating below 1.0 ACH. I collaborated directly with the architect to design robust air barrier details and worked onsite with the builder to inspect and troubleshoot penetrations, transitions, and continuous exterior insulation integration, ensuring a high-performance building envelope.



Created: Aug 20, 2026
Please sign in to comment on projects
Location
Toronto, ON
Status
Ready
Posted
August 20, 2026
Crews credited
1
Likes
Comments
Toronto, ON
Exact addresses are never published. Projects show the municipality only.