01 · ABOUT THIS PROJECT

We provided comprehensive structural steel fabrication, welding, and erection services for the construction of a new school in Vancouver, BC. Our team managed every stage of the metalwork, from custom steel component design and precision cutting to fit-up, clean multi-pass welding, and complete on-site installation. We erected the multi-story structural frame, roof trusses, and open-web joists, while adapting custom miscellaneous metals to exact site specifications. Every steel assembly was installed safely and accurately to meet all engineering and structural integrity requirements.

02 · PHOTOS
Welder in an aerial lift welding a structural steel beam connection against a clear blue sky.
Upward view through the structural steel roof frame and trusses of a school building under construction.
Close-up view of a clean, multi-pass vertical weld seam on structural steel plates.
Close-up of a completed multi-pass weld joining a thick steel gusset plate to a structural beam.
Underside view of a structural weld connecting a steel gusset plate to a framing beam.
Concrete foundation wall supporting assembled structural steel columns, cross beams, and roof joists.
Construction staging area with raw steel materials, a mobile crane, and the building frame in the background.
Ironworker in a bucket lift fitting and welding steel truss connections high on the structural frame.
Detailed close-up of a structural weld bead securing a steel bracket to a gusset plate.
Front exterior perspective of the multi-story structural steel framework for a school building.
Steel building skeleton with roof beams and temporary tarps over concrete walls on a sunny construction site.
Heavy structural steel diagonal bracing connected to a gusset plate anchored to a concrete wall.
Wide view of the school construction site showing the assembled steel superstructure, boom lifts, and trucks.
Steel skeleton frame showcasing roof joists and open bay staging area with construction vehicles.
Close-up detail of a precise, multi-pass weld along an angled steel brace plate.
Out-of-focus view of the multi-story steel building framework on the active construction jobsite.
Close-up of a finished structural weld securing a steel brace with an alignment pin in place.
Mobile crane and boom lifts positioning and securing a steel beam on the upper framework of the building.
Active school construction site featuring a mobile crane, telehandler, and multi-tier structural steel framing.
Interior perspective looking through open-web steel roof joists with two boom lifts positioned below.
Tall steel column and extensive roof truss system viewed from the gravel ground with aerial work platforms.
Ground-level view beneath steel floor decking and structural columns next to a concrete retaining wall.
Wide shot of the school construction jobsite showing steel framing and green exterior wall sheathing.
Project photo 5543
Project photo 5546

Created: Aug 18, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Location

Vancouver, BC

Status

Ready

Posted

August 18, 2026

Crews credited

1

Likes

Comments

LOCATION

Vancouver, BC

Exact addresses are never published. Projects show the municipality only.

More projects like this one

Other work on Projekt Network

See all →
Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

0

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing

3

0

More from this crew

Other work by the people who built this

See all →