Industrial Concrete Slab Repair in Vancouver, BC

Posted August 18, 2026

A

Built by ACH Mechanical ltd

01 · ABOUT THIS PROJECT

We completed commercial concrete slab restoration, drainage piping repair, and water mitigation for an industrial facility in Vancouver, BC. Our team addressed severe structural deterioration, cracking, and water seepage across the plant floor. We excavated damaged sections, updated subsurface piping, prepped aggregate base layers, and installed vapor barriers with steel reinforcement grids. After pouring high-strength industrial concrete and building dedicated equipment pads, we finished and cured the slabs to ensure durable, leak-free operations.

02 · PHOTOS
Trench cut into concrete flooring near mechanical equipment and piping for infrastructure repairs.
Insulated curing tarps covering sections of freshly poured concrete in an industrial facility.
Excavated gravel base with newly laid utility pipe and a compact track loader in the facility.
Concrete finishers using hand trowels to smooth the surface of newly poured equipment pads.
Steel rebar grid installed over heavy-duty poly vapor barrier before concrete placement.
Completed concrete floor slab section next to covered curing areas in a manufacturing plant.
Overhead view of a concrete floor repair area with a pipe penetration and bagged materials.
Construction crew pouring wet concrete using a pump hose over a steel rebar grid inside a warehouse.
Steel rebar mesh panels placed over sections of a concrete floor in a commercial facility.
Workers preparing and grading the gravel sub-base inside a commercial facility before pouring concrete.
Fresh concrete slab poured in an industrial warehouse with looped rebar dowels extending from the surface.
Steel rebar reinforcement grid across an industrial facility floor with welding work in the background.
Freshly screeded concrete pads contained in wood formwork on the facility floor.
Worker holding PVC piping next to a plate compactor on a leveled gravel floor base.
Freshly poured concrete floor with exposed curved rebar dowels protruding along the joint edges.
Workers using a concrete pump hose to pour wet concrete over a rebar reinforcement grid.
Chipped core hole in an aged concrete slab near mechanical equipment during inspection.
Smooth finished surface of a newly poured industrial concrete floor slab.
Exposed rebar reinforcement tied into existing concrete adjacent to a wood frame.
Mechanical room concrete floor with a chipped opening and a closed for construction notice.
Industrial facility floor with plastic sheeting and protective tarps over newly restored concrete.
Overhead view of a rebar reinforcement grid on rebar chairs over vapor barrier before pouring.
Freshly poured concrete slab section alongside protective curing blankets in an industrial shop.
Multiple curing blankets protecting newly placed concrete inside a commercial warehouse.
Crew leveling and preparing the aggregate base for a new concrete slab in a warehouse.
Complete rebar reinforcement grid laid over a vapor barrier with metal cutting sparks in the background.
Close-up of an expansion joint with exposed steel rebar along an existing concrete slab.
Drainage pipe installed within trench in compacted gravel subbase with hand tools nearby.
Large tarps covering newly placed concrete slab sections to aid the curing process.
Steel rebar reinforcement grids assembled and tied for concrete equipment pads.
Deteriorated concrete floor with broken aggregate around machinery base prior to repair.
Cured concrete equipment foundation pad raised above the industrial facility floor.
White PVC drainage pipe assembled with fittings in a floor trench along a concrete slab edge.
Overhead view of timber forms with tied rebar grids ready for industrial concrete placement.
Newly poured concrete slab section featuring exposed rebar dowels ready for the adjacent pour.
Compacted aggregate subbase prepared with drainage piping, plate compactor, and mini excavator.
Crew members monitoring the placement of concrete through a pump hose over steel rebar mesh.
Steel rebar reinforcement grid installed on chairs over vapor barrier inside an industrial building.
Expansive warehouse interior with tarps covering curing concrete floor sections.
Wooden formwork and steel rebar mesh prepared for pouring raised concrete equipment pads.
Excavated industrial floor area with a plate compactor, piping, and workers preparing the base.
Newly poured concrete floor with exposed steel tie hooks protruding along section boundaries.
Heavy-duty insulated curing tarps laid over newly poured concrete floor slabs.
Protective curing blankets laid over newly poured concrete slab sections inside an industrial building.
Fresh concrete slab with row of steel dowels extending from perimeter joints.
Worker carrying PVC pipe across prepared gravel base with a plate compactor nearby in an industrial facility.
Installed rebar reinforcement grid set on supports over a moisture barrier across the warehouse floor.
Freshly poured and leveled concrete equipment pads framed with wooden forms inside the facility.
Large expanse of smooth wet concrete floor in an industrial building.
Freshly finished and smoothed concrete floor slab spanning a large industrial workshop.
Steel rebar reinforcement pin anchored into concrete near an interior framing column.
Worker sitting near prefabricated rebar mesh sections positioned on the facility concrete floor.
Concrete workers in high-visibility gear screeding fresh concrete across a reinforced slab.
Construction crew placing and leveling wet concrete from a pump hose over rebar grid.
Damaged concrete slab with an exposed trench and chipped surface near equipment supports.
Steel rebar reinforcement grid laid over plastic vapor barrier on an excavated warehouse floor.
Worker near steel rebar mesh panels laid out across a concrete slab during floor restoration.
Steel rebar mesh placed over plastic moisture barrier across the entire slab footprint.
Worker inspecting rebar grid installation over a prepared subfloor before concrete placement.
Detail view of steel rebar reinforcement installed along a concrete slab edge.

Created: Aug 18, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Location

Vancouver, BC

Status

Ready

Posted

August 18, 2026

Crews credited

1

Likes

Comments

LOCATION

Vancouver, BC

Exact addresses are never published. Projects show the municipality only.

More projects like this one

Other work on Projekt Network

See all →
Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

1

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing