PROJECT · SURREY, BC
READYPosted August 18, 2026
Built by ACH Mechanical ltd
Built by
ACH Mechanical ltdI coordinated directly with the general contractor in Surrey, BC, to resolve a critical piping system failure caused by a seized bolt. The broken bolt had jammed inside the assembly, preventing flange disassembly and causing operational delays. I safely extracted the damaged bolt, removed the old flange, and prepped the pipe surfaces for a replacement flange installation to restore full sealing and system reliability. Working closely with the team minimized downtime and kept the project moving forward.








Created: Aug 18, 2026
Please sign in to comment on projects
Location
Surrey, BC
Status
Ready
Posted
August 18, 2026
Crews credited
1
Likes
Comments
Surrey, BC
Exact addresses are never published. Projects show the municipality only.