01 · ABOUT THIS PROJECT

I developed a virtual 3D builder field guide modeling building envelope control layer continuity based on CMHC Sixplex residential plans. Using SketchUp and technical plan reading, I modeled critical transition details across the entire assembly—from foundation sill plates to mid-floor rim joists and roof connections. This field manual highlights airtightness, WRB continuity, vapor control integration, and thermal insulation sequencing to ensure resilient building performance on multi-unit wood-frame construction.

SCOPE AND TRADES ON THIS BUILD
Plan Reading
Sketchup
Project Coordination, Architectural Design, Project Administration
Technical problem-solving
02 · WHO BUILT IT
Collaborator sections
Matthew Allen
Plan Reading
Sketchup
Project Coordination, Architectural Design, Project Administration
Technical problem-solving
Matthew Allen photo 1Matthew Allen photo 2Matthew Allen photo 3Matthew Allen photo 4Matthew Allen photo 5
Gianluca Infusino
Connor Malloy
03 · PHOTOS
3D architectural cross section model of a multi-story wood-frame building assembly showing foundation, walls, and roof.
3D diagram illustrating sill gasket and dual sealant bead installation over a concrete foundation wall with anchor bolts.
3D model showing vapor barrier membrane wrapped around an engineered wood rim joist and tacked onto the subfloor.
3D model of sloped roof framing and joist cavities filled with mineral wool batt insulation.
Exploded 3D diagram showing weather-resistive air barrier membrane continuous across foundation, wall, and roof transitions.

Created: Mar 7, 2026

04 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

March 7, 2026

Crews credited

3

Likes

Comments

WHO BUILT IT · 3 CREDITED

More projects like this one

Other work on Projekt Network

See all →
Record Label Office Fit-Out, Downtown Toronto

Record Label Office Fit-Out, Downtown Toronto

Dan Robinson + 2 collaborators
Client, architect, and engineer collaboration
Value Engineering
Estimating

6

0

3 crews

4-Unit Laneway Multiplex in Toronto's Junction

4-Unit Laneway Multiplex in Toronto's Junction

Client, architect, and engineer collaboration
Architecture
Design development

5

0

Modern Ski Chalet Design in Amherst, QC

Modern Ski Chalet Design in Amherst, QC

Amherst, QC

Specifications
Site Planning
Budgeting

5

2

Net Zero Modern Duplex Architecture & Build

Net Zero Modern Duplex Architecture & Build

Client, architect, and engineer collaboration
Architecture
Design development

4

0

More from this crew

Other work by the people who built this

See all →
CMHC Sixplex Floor-to-Wall Air Sealing Mock-Up

CMHC Sixplex Floor-to-Wall Air Sealing Mock-Up

Connor MalloyGianluca InfusinoMatthew Allen
Matthew Allen + 2 collaborators
Carpentry
Air Sealing
Communication

3

1

3 crews

Pod Wall Framing at George Brown College

Pod Wall Framing at George Brown College

Blueprint reading
Framing
Communication

7

1

Concrete Pool Equipment Pad Pour & Finish

Concrete Pool Equipment Pad Pour & Finish

Concrete Formwork
Concrete Finishing

3

0