PROJECT

READY

Pool Coping and Interlock Installation

Posted December 10, 2025

Gianluca Infusino

Built by Gianluca Infusino

01 · ABOUT THIS PROJECT

We completed this pool coping and interlocking stone installation to create a clean, durable border around the new swimming pool. The coping stones sit securely along the pool lip, followed by interlocking pavers installed level and slightly sloped to ensure proper drainage and prevent water pooling. We placed concrete mix behind the stone perimeter to lock everything firmly in place and prevent any movement over time. The surrounding aggregate base prepares the area for seamless hardscaping alongside the backyard deck and fencing.

02 · PHOTOS
Project photo 858

Created: Dec 10, 2025

03 · DISCUSSION
Profile
Ian MacFaydenDec 10, 2025

beauty! What was your roll in this? Looks very well executed. well done

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

December 10, 2025

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Underground rough-in, school projects in building a 3pc washroom

Underground rough-in, school projects in building a 3pc washroom

Jonathan Ayoola
Posted by Jonathan Ayoola

Brampton, ON

Reading blueprints and construction drawings, Measuring and cutting materials accurately

3

0

New deck build and drawings

New deck build and drawings

William Golden
Posted by William Golden

Muskoka Lakes, ON

4

0

Wiring Simulation

Wiring Simulation

Posted by Dillon Wilson

Oakville, ON

2

0

wainscotting job

wainscotting job

Burlington, ON

Wainscoting

4

0

More from this crew

Other work by the people who built this

See all →
Transition Mock-Up

Transition Mock-Up

Connor MalloyGianluca InfusinoMatthew Allen
Matthew Allen + 2 collaborators
Carpentry
Air Sealing
Communication

3

1

3 crews

Virtual Builder Field Manual - Control Layer Continuity

Virtual Builder Field Manual - Control Layer Continuity

Connor MalloyGianluca InfusinoMatthew Allen
Matthew Allen + 2 collaborators
Technical problem-solving
Sketchup
Project Coordination, Architectural Design, Project Administration

3

0

3 crews

Pod Wall Framing at George Brown College

Pod Wall Framing at George Brown College

Blueprint reading
Framing
Communication

7

1

Concrete Pool Equipment Pad Pour & Finish

Concrete Pool Equipment Pad Pour & Finish

Concrete Formwork
Concrete Finishing

3

0