PROJECT
READYPosted December 10, 2025
Built by Gianluca Infusino
Built by
Gianluca InfusinoI formed and poured a 4'x7' concrete equipment pad to provide a solid, level foundation for pool equipment. The project involved preparing the ground, building precise timber formwork, and pouring the concrete mix next to the exterior shed wall. Once poured, I screeded and finished the surface with a clean, smooth troweled finish for long-term durability. A sturdy concrete pad ensures pool filtration and pumping systems sit on a stable, level base.

Created: Dec 10, 2025
Please sign in to comment on projects
Status
Ready
Posted
December 10, 2025
Crews credited
1
Likes
Comments
Other work on Projekt Network