PROJECT · SURREY, BC

READY

Rebuild pipe cylinder

Posted August 18, 2026

A

Built by ACH Mechanical ltd

01 · ABOUT THIS PROJECT

This project involved installing a new tank for a cylinder‑testing operation and completing mechanical repairs to the existing piping system. The work included welding, structural reinforcement, and upgrades to ensure the system could support ongoing testing activities. Project Scope: - New Tank Installation Installed a new tank designed for cylinder testing, including placement, alignment, and integration with the existing mechanical system. - Piping System Repair & Upgrades Removed and replaced a damaged section of piping. Repaired old welds, addressed cracking in the system, and restored full mechanical integrity. - Structural Reinforcement Installed new footings and bracing to support the tank and associated piping. Ensured proper load distribution and long‑term stability. - Welding & Fabrication Completed all required welding work, including repairing failed welds and fabricating new supports as needed. Outcome: The new tank was installed successfully, and the piping system was fully repaired and reinforced. The upgraded structure now supports safe and reliable cylinder testing operations.

02 · PHOTOS
Project photo 5572
Project photo 5570
Project photo 5569
Project photo 5571
Project photo 5573
Project photo 5574
Project photo 5568

Created: Aug 18, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Location

Surrey, BC

Status

Ready

Posted

August 18, 2026

Crews credited

1

Likes

Comments

LOCATION

Surrey, BC

Exact addresses are never published. Projects show the municipality only.

More projects like this one

Other work on Projekt Network

See all →
Simple steel work

Simple steel work

Fabrication
Welding
Attention to Detail

1

0

2026 FIFA World Cup Training Facility

2026 FIFA World Cup Training Facility

Aaron Waldt
Posted by Aaron Waldt

Toronto, ON

Airsealing

6

0

Rondeau Passive House

Rondeau Passive House

Aaron Waldt
Posted by Aaron Waldt

Chatham-Kent, ON

4

0

New build on Lake Rosseau

New build on Lake Rosseau

Stepping Stone MasonryPin-Co Power IncFarr Mechanical HummingbirdHill Muskoka
HummingbirdHill Muskoka + 3 collaborators

Muskoka Lakes, ON

Site supervision
Project management
finish carpentry

11

1

4 crews

More from this crew

Other work by the people who built this

See all →