PROJECT · SURREY, BC

READY

Piping repair

Posted August 18, 2026

A

Built by ACH Mechanical ltd

01 · ABOUT THIS PROJECT

I was responsible for coordinating directly with the general contractor to resolve a critical issue involving a broken bolt inside the facility’s piping system. The damaged bolt prevented the flange from being removed and was causing operational delays. Project Scope: - Broken Bolt Extraction Identified and removed a bolt that had seized inside the piping system, preventing disassembly and maintenance. - Flange Removal & Replacement Removed the existing flange, prepared the piping surfaces, and installed a new flange to restore proper sealing and system reliability. - Mechanical Coordination Worked closely with the general contractor to plan the repair sequence, ensure safe execution, and minimize downtime during the repair. Outcome: The piping system was fully restored with a new flange installed and the seized bolt successfully removed. This eliminated the obstruction, improved system reliability, and allowed the contractor to proceed with the rest of the project without further delays.

02 · PHOTOS
Project photo 5531
Project photo 5527
Project photo 5530
Project photo 5525
Project photo 5529
Project photo 5532
Project photo 5526
Project photo 5528

Created: Aug 18, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Location

Surrey, BC

Status

Ready

Posted

August 18, 2026

Crews credited

1

Likes

Comments

LOCATION

Surrey, BC

Exact addresses are never published. Projects show the municipality only.

More projects like this one

Other work on Projekt Network

See all →
Simple steel work

Simple steel work

Fabrication
Welding
Attention to Detail

2

0

2026 FIFA World Cup Training Facility

2026 FIFA World Cup Training Facility

Aaron Waldt
Posted by Aaron Waldt

Toronto, ON

Airsealing

7

0

Rondeau Passive House

Rondeau Passive House

Aaron Waldt
Posted by Aaron Waldt

Chatham-Kent, ON

5

0

New build on Lake Rosseau

New build on Lake Rosseau

Stepping Stone MasonryPin-Co Power IncFarr Mechanical HummingbirdHill Muskoka
HummingbirdHill Muskoka + 3 collaborators

Muskoka Lakes, ON

Site supervision
Project management
finish carpentry

11

2

4 crews

More from this crew

Other work by the people who built this

See all →