Built by ACH Mechanical ltd
Built by
ACH Mechanical ltdI was responsible for coordinating directly with the general contractor to resolve a critical issue involving a broken bolt inside the facility’s piping system. The damaged bolt prevented the flange from being removed and was causing operational delays. Project Scope: - Broken Bolt Extraction Identified and removed a bolt that had seized inside the piping system, preventing disassembly and maintenance. - Flange Removal & Replacement Removed the existing flange, prepared the piping surfaces, and installed a new flange to restore proper sealing and system reliability. - Mechanical Coordination Worked closely with the general contractor to plan the repair sequence, ensure safe execution, and minimize downtime during the repair. Outcome: The piping system was fully restored with a new flange installed and the seized bolt successfully removed. This eliminated the obstruction, improved system reliability, and allowed the contractor to proceed with the rest of the project without further delays.








Created: Aug 18, 2026
Please sign in to comment on projects
Location
Surrey, BC
Status
Ready
Posted
August 18, 2026
Crews credited
1
Likes
Comments
Surrey, BC
Exact addresses are never published. Projects show the municipality only.
Other work on Projekt Network
New build on Lake Rosseau
Muskoka Lakes, ON
11
2
4 crews
Other work by the people who built this