PROJECT · CHILLIWACK, BC
READYPosted August 18, 2026
Built by ACH Mechanical ltd
Built by
ACH Mechanical ltdOur team was brought in to support a critical maintenance and repair package at a water treatment facility. The project involved mechanical removal, system upgrades, and electrical restoration to bring the plant back to safe, reliable operation. Project Scope: - Steam Line Removal & Replacement Removed existing steam lines, fittings, and outdated components. Completed full maintenance and repair work, including welding, fitting replacement, and system integrity improvements. - Mechanical Repairs & Maintenance Inspected and serviced all associated piping and mechanical assemblies. Repaired worn sections, corrected alignment issues, and restored proper flow and pressure performance. - Electrical Conduit Repairs Addressed multiple electrical issues throughout the facility. Repaired damaged conduits, replaced compromised sections, and ensured proper routing and protection for all electrical runs. - Motor Replacement & Commissioning Removed failing motors and installed new units. Completed alignment, wiring, testing, and commissioning to ensure reliable operation and compliance with plant requirements. Outcome: The project restored both mechanical and electrical reliability across the affected systems. All steam lines, conduits, and motors were replaced or repaired to meet operational standards, reducing downtime and improving long-term performanc


















Created: Aug 18, 2026
Please sign in to comment on projects
Location
Chilliwack, BC
Status
Ready
Posted
August 18, 2026
Crews credited
1
Likes
Comments
Chilliwack, BC
Exact addresses are never published. Projects show the municipality only.
Other work on Projekt Network
New build on Lake Rosseau
Muskoka Lakes, ON
11
2
4 crews
Other work by the people who built this