Built by Muskoka Timberworx
Built by
Muskoka TimberworxMuskoka Timberworx completed this new custom cottage build from structural framing through to complete exterior siding and finishes. We managed every stage of construction on this lakeside property, beginning with subfloor framing, wall construction, crane-assisted truss setting, and roof sheathing. The build was enclosed with high-performance weather barrier and finished with durable horizontal wood-tone siding, bold black modern gables, energy-efficient black-framed windows, and integrated decking. Our team took pride in delivering precision carpentry and dependable craftsmanship from the ground up.
















Created: Jul 22, 2026

They would have been prepping & insulating the basement floor before concrete installation.

I saw Great Northern Insulation in one of the photos, what were they insulating at that stage?
Please sign in to comment on projects
Status
Ready
Posted
July 22, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Front entrance staircase, Toronto — PT structure, full cedar finish
Toronto, ON
5
1
Other work by the people who built this