I completed custom framing, drywall installation, and taping to create a clean angled bulkhead concealing ductwork above a staircase. To properly box in the exposed HVAC ducts and piping running across the ceiling opening, I built a custom timber frame shaped to maintain maximum headroom and match the surrounding angles. After framing, I installed drywall precisely around the angles and applied taping, mudding, and finishing coats to blend the soffit seamlessly into the adjacent walls and ceiling, leaving a smooth surface ready for paint.

SCOPE AND TRADES ON THIS BUILD
Drywall Finishing
Drywall
Framing, Framer, Carpentry
02 · PHOTOS
Finished drywall and taping on a newly constructed angled ceiling bulkhead above a basement staircase.
Custom wood frame enclosing exposed ductwork and pipes above an interior staircase before drywall installation.

Created: Jul 11, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

July 11, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →

More from this crew

Other work by the people who built this

See all →
Bathroom Floor Tile and Baseboard Installation

Bathroom Floor Tile and Baseboard Installation

Posted by Ayden McDonald
Baseboard
Minor Plumbing
Large format tile

4

2

Partition Wall Framing, Drywall, and Door Installation

Partition Wall Framing, Drywall, and Door Installation

Posted by Ayden McDonald
Drywall Finishing
Drywall
Basic framing

1

0

Basement Partial Finish: Insulation, Drywall & Paint

Basement Partial Finish: Insulation, Drywall & Paint

Posted by Ayden McDonald
Interior Painting
Insulation
Drywall Finishing

1

0