PROJECT
READYPosted July 11, 2026
Built by Ayden McDonald
Built by
Ayden McDonaldUpgraded this bathroom floor with durable large format tile installation, complete with subfloor prep, grouting, and clean baseboard trim. I handled the entire bathroom flooring update from start to finish, beginning with the removal of the old flooring and bathroom fixtures. After prepping the subfloor with a protective underlayment membrane, I installed and grouted new large format floor tiles. To complete the space, I reinstalled the vanity and toilet, hooked up the plumbing, and fitted fresh baseboards around the perimeter for a clean, polished finish.




Created: Jul 11, 2026
The homeowner made other arrangements while the floor was being completed.

Were they still using the bathroom while you were tiling the floor?
Please sign in to comment on projects
Status
Ready
Posted
July 11, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Other work by the people who built this