PROJECT

READY

Custom Home Drywall in Niagara-on-the-Lake

Posted May 5, 2026

Vedro Drywall

Built by Vedro Drywall

01 · ABOUT THIS PROJECT

We completed custom home drywall installation, boarding, taping, and finishing for this new residential build in Niagara-on-the-Lake. The project included hanging and taping drywall throughout expansive living areas with soaring high ceilings, requiring mobile scaffolding for precise overhead ceiling installation. We installed moisture-resistant drywall in the bathrooms and finished architectural details, including sloped ceiling transitions, recessed fixtures, custom bulkheads, and a spacious multi-car garage. Every seam, corner, and screw line was carefully taped and mudded to deliver smooth, paint-ready walls across the entire home.

02 · PHOTOS
Exterior view of a custom home under construction covered in snow and house wrap at dusk in Niagara-on-the-Lake.
Exterior front view of the wood-framed custom house during winter construction with snow on the ground.
Interior great room before drywall showing insulation, ceiling vapor barrier, resilient channels, and scaffolding.
High-ceiling great room during ceiling drywall installation with stacked drywall sheets on the subfloor.
Spacious open-concept room with ceiling drywall hung and drywall scraps on the floor.
Bathroom framed with moisture-resistant green board drywall installed around rough plumbing.
Upper floor room with drywall sheets hung across walls and flat ceiling, overlooking exterior views through large windows.
Bedroom with angled ceiling drywall hung and clean cuts along the sloped roofline.
High-ceiling living area with drywall installed and initial coat of joint compound and tape applied to seams.
Large open room with drywall taped and mudded along ceiling bulkheads and perimeter walls.
Wide shot of expansive great room with taped ceiling joints, finished drywall corners, and mobile scaffolding.
Corner detail showing crisp drywall bead, taped joints, and framed rough opening for HVAC or access.
Tall scaffolding standing in the center of a large living room during the ceiling drywall taping and finishing phase.
Three-car garage with completed ceiling drywall taping, mudded joints, and overhead garage door tracks installed.
Completed drywall taping and mudding throughout a large custom great room with high ceilings and large windows.

Created: May 5, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

May 5, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

0

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing

3

0

closets

closets

David Dow
Posted by David Dow
Carpenter
Cabinet

1

0

More from this crew

Other work by the people who built this

See all →