Andrew JamesWe completed full main-level drywall taping to a smooth Level 4 finish ready for painting for a homeowner in Burlington, ON. Hired directly by the homeowner for this main floor renovation, we taped, mudded, and finished all drywall joints, fasteners, and corner beads throughout the living spaces, entryway, kitchen area, and stairwell. Every ceiling, wall seam, and beam transition was meticulously coated and sanded down to provide an even, uniform surface ready for final paint.