Project
Every project on Projekt Network is a verified record of who worked together — searchable by trade, region, and scope. Not listings. Proof of work.
Over the course of a decade, we completed a number of docks for the club each winter. Today, all 14 docks including the dining room of the clubhouse, the dining patio and the ramps for the sailing club are all on Dockside Steel. Pile depths ranged from 40 feet, to the deepest one at 134 feet. It’s a long process splicing piles together, especially long when you’re inside the dining room welding pieces on 6 feet at a time. Some years, with the help of Rieger Contracting and their barge, we had multiple crews going at once. One year we drove 2.3 kilometres worth of piling.









Created: Mar 15, 2026

I’d love to go back and see how much piling was used but unfortunately I doubt we’ve kept that information from the early docks. The year we drove over 2kms of pipe we only did the dining patio and two finger docks.
Wild to think how much steel is under here! Nice work to your crews