Bathroom Plumbing Rough-In | Brampton, ON

Posted August 31, 2026

Jonathan Ayoola

Built by Jonathan Ayoola

01 · ABOUT THIS PROJECT

I completed this bathroom rough-in and underground plumbing installation in Brampton, ON, setting up drainage, venting, and water lines. Working from blueprints and construction drawings, I measured and cut every pipe accurately to establish proper heights and slopes for the lavatory, sink, urinal, and tub drain. The project included laying sub-floor underground drain runs in gravel bedding and framing out complete ABS drain-waste-vent (DWV) stacks and water supply lines within stud walls to ensure reliable flow and code compliance.

SCOPE AND TRADES ON THIS BUILD
Reading blueprints and construction drawings, Measuring and cutting materials accurately
02 · PHOTOS
Plumbing rough-in inside timber stud framing showing ABS drainage stacks, water supply lines, utility sink, and urinal.
Underground drainage pipe layout laid in crushed stone bedding beneath bathroom wall framing and sink rough-in.
Black ABS drain and vent pipes routed through timber wall studs beside a bathtub basin rough-in.
Wall-hung commercial urinal rough-in with flushometer valve connected to an ABS P-trap and vertical vent pipe.
ABS sanitary drainage and venting assembly with capped rough-in outlet routed through interior wall framing.

Created: Aug 31, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Location

Brampton, ON

Status

Ready

Posted

August 31, 2026

Crews credited

1

Likes

Comments

LOCATION

Brampton, ON

Exact addresses are never published. Projects show the municipality only.

More projects like this one

Other work on Projekt Network

See all →
Entryway Closet Renovation & Built-Ins in Woodstock, ON

Entryway Closet Renovation & Built-Ins in Woodstock, ON

Jamie Phillips
Posted by Jamie Phillips

Woodstock, ON

Drywall
Door and trim install
Interior Painting

2

0

Georgian Bay Boathouse Dock

Georgian Bay Boathouse Dock

SMAW Welding
Barging
Building Raising

3

0