PROJECT

READY

Commercial HVAC Ventilation & Fire Damper Installation

Posted July 1, 2026

Gurjeet Singh Sandhu

Built by Gurjeet Singh Sandhu

01 · ABOUT THIS PROJECT

I installed a complete commercial HVAC ventilation system and integrated fire dampers for this newly constructed commercial space. Working with exposed concrete ceilings, I fabricated and installed spiral ductwork and insulated rectangular supply ducts to ensure optimal airflow and code compliance. The installation included mounting the overhead air handling equipment, routing custom sheet metal transitions, and fitting approved fire dampers through structural wall penetrations. Every duct run was securely suspended and sealed to maximize efficiency throughout the building layout.

02 · PHOTOS
Ceiling-mounted commercial HVAC unit with insulated and spiral ductwork installed below an exposed concrete slab.
Exposed spiral sheet metal ventilation ducts running across concrete column into framed wall fire damper openings.

Created: Jul 1, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

July 1, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Entryway Closet Renovation & Built-Ins in Woodstock, ON

Entryway Closet Renovation & Built-Ins in Woodstock, ON

Jamie Phillips
Posted by Jamie Phillips

Woodstock, ON

Drywall
Door and trim install
Interior Painting

2

0

Georgian Bay Boathouse Dock

Georgian Bay Boathouse Dock

SMAW Welding
Barging
Building Raising

3

0