PROJECT

READY

Half Bath to Full Bathroom Renovation

Posted June 27, 2026

Daniel Rogers

Built by Daniel Rogers

01 · ABOUT THIS PROJECT

This bathroom renovation transformed a simple half bath with just a sink and toilet into a complete full bathroom featuring a walk-in shower. We started by breaking through the concrete floor to rough in new drain lines and plumbing, then framed out the walls and added fresh insulation. The finished space includes a sliding glass shower enclosure with marble-patterned tile walls, a new white vanity with matte black hardware, updated flooring, and a modern toilet set against freshly painted grey walls.

02 · PHOTOS
Exposed wall studs, yellow insulation, and a trenched concrete floor showing rough-in plumbing during a bathroom remodel.
White toilet installed in a renovated bathroom with painted grey walls, white trim, and wood-look flooring.
Glass sliding shower enclosure with marble-look tile walls next to a white vanity with black faucet and hardware.

Created: Jun 27, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

June 27, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Entryway Closet Renovation & Built-Ins in Woodstock, ON

Entryway Closet Renovation & Built-Ins in Woodstock, ON

Jamie Phillips
Posted by Jamie Phillips

Woodstock, ON

Drywall
Door and trim install
Interior Painting

2

0

Georgian Bay Boathouse Dock

Georgian Bay Boathouse Dock

SMAW Welding
Barging
Building Raising

3

0

More from this crew

Other work by the people who built this

See all →