PROJECT

READY

Warehouse EV Charger Splitter & Disconnect Setup

Posted June 24, 2026

Cole Brome

Built by Cole Brome

01 · ABOUT THIS PROJECT

Built by

Cole Brome

We installed a splitter trough and heavy-duty fused disconnect switch for a warehouse EV charger installation. The project involved mounting the electrical enclosures securely to the concrete masonry wall, pulling and routing large feeder conductors through conduit, and wiring the three-phase fused disconnect. All lines were properly phased, cleanly trained, and terminated to safely support commercial vehicle charging.

02 · PHOTOS
Open fused disconnect switch enclosure showing three cartridge fuses and heavy-gauge wiring with color-coded phase tape.
Wall-mounted electrical splitter enclosure and fused disconnect switch installed on a concrete block wall.

Created: Jun 24, 2026

03 · DISCUSSION
Profile
Dan RobinsonJun 24, 2026

I had to turn my head, now I get it!

Profile
Dan RobinsonJun 24, 2026

I had to turn my head, now I get it!

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

June 24, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

0

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing

3

0

closets

closets

David Dow
Posted by David Dow
Carpenter
Cabinet

1

0

Port Colbourne ADU

Port Colbourne ADU

Vedro Drywall
Posted by Vedro Drywall
#ResidentialInsulation
Drywall Boarding

3

0

More from this crew

Other work by the people who built this

See all →