Project
Every project on Projekt Network is a verified record of who worked together — searchable by trade, region, and scope. Not listings. Proof of work.
Built by
Rieger ContractingWe were called into strip the material on top of the water reservoir in Bracebridge. We were only able to have 9 tons in a localized area at a time, so we used a fleet of skid steers to remove the material. To be more efficient, we brought in our smallest screening plant from our pit. We were able to screen the existing soil and reuse most of what was already there when it came to the backfill. We brought in fresh, more nutrient dense topsoil for a topdressing before we finished. All of this work was so a new waterproof membrane could be installed to keep the towns drinking water clean.





Created: May 21, 2026