PROJECT
READYPosted April 23, 2026
Built by Shaun Maiato
Built by
Shaun MaiatoI completed the heavy timber framing for a custom shoreline boat cover and shelter on Sturgeon Lake, prepping the structure for steel roofing. The timber frame was built along the waterfront slip and dock platform to provide solid, weather-resistant protection for watercraft. Heavy timber posts, rafters, and diagonal bracing were constructed to support a split-pitch roof design. With the structure framed and secured, it is ready for the final steel roof installation.

Created: Apr 23, 2026
Please sign in to comment on projects
Status
Ready
Posted
April 23, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Other work by the people who built this