PROJECT
READYPosted April 18, 2026
Built by Signature Finish Renovations (Fozzie)
I completed this full basement renovation featuring demo, framing, drywall installation, drywall taping, trim, and interior painting. Except for the electrical and plumbing rough-ins, all carpentry and finish work across this spacious basement living area and adjoining room was completed by myself. The project also included tiling and installing new doors and trim. A second stage of this renovation is planned to install a kitchen and wet bar designed to cleanly incorporate and conceal the electrical panel.






Created: Apr 18, 2026
Please sign in to comment on projects
Status
Ready
Posted
April 18, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Front entrance staircase, Toronto — PT structure, full cedar finish
Toronto, ON
3
0
Other work by the people who built this