Built by Canadian Sanitation
Built by
Canadian SanitationWe completed a sanitary lateral installation to the municipal sewer connection at a 4.4-meter burial depth in Huronia. To safely manage the deep excavation, we utilized aluminum trench shoring boxes throughout the trench line. Because the excavation ran adjacent to overhead utility infrastructure, K-Line maintained a utility pole hold to ensure the pole anchor remained secure throughout the dig. We set the green sewer pipe to precise grade using laser leveling equipment before backfilling.