PROJECT
READYPosted March 12, 2026
Built by Abdimalik Sheikh
Built by
Abdimalik SheikhI installed and configured structured Ethernet cabling running from the main distribution center (MDF) to an intermediate distribution frame (IDF). The project involved pulling data cabling through stud walls, mounting a patch panel onto an open-frame equipment rack, and terminating lines to wall jacks. Following the physical runs and terminations, I conducted thorough testing on both the phone backbone and Ethernet backbone to verify connectivity, signal integrity, and network performance.


Created: Mar 12, 2026
Please sign in to comment on projects
Status
Ready
Posted
March 12, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Front entrance staircase, Toronto — PT structure, full cedar finish
Toronto, ON
3
0