PROJECT

READY

Three-Season Solarium Renovation for Clinic

Posted February 20, 2026

V

Built by Vona Built general contracting inc

01 · ABOUT THIS PROJECT

We completed a full three-season solarium renovation for a clinic, featuring ceiling insulation, custom drywall, and modern comfort features. The project included insulating the ceiling structure with batt insulation and vapor barrier, followed by drywall installation, taping, and painting. We added recessed pot lights, modern wood-blade ceiling fans, and a linear fireplace framed in stacked stone veneer with a wood mantel, creating an inviting, light-filled space for clients and staff year-round.

02 · PHOTOS
Finished solarium ceiling with two wood-blade ceiling fans, recessed pot lights, brick walls, and arched windows.
Two modern wooden ceiling fans installed on a finished white ceiling in a brick sunroom with arched windows.
Linear fireplace built with stacked stone veneer and a wood mantel set against an exterior brick wall.
Taped and mudded drywall ceiling in the sunroom showing rough-in cutouts for pot lights and electrical wiring.
Drywall compound applied to the solarium ceiling above interior French doors and brick walls.
Ceiling drywall installed in the solarium with cutout holes for recessed lighting and ceiling fixtures.
Drywall sheets being secured to the ceiling over pink fiberglass insulation and clear vapor barrier.
Drywall panels installed across the ceiling framing above the sunroom's brick walls and arched windows.
Exposed ceiling joists with pink batt insulation, electrical wiring, and scaffolding during sunroom construction.

Created: Feb 20, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

February 20, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Aluminum window

Aluminum window

walter  sanchez
Posted by walter sanchez

Vaughan, ON

Blue print reading

1

0

Front entrance staircase, Toronto — PT structure, full cedar finish

Front entrance staircase, Toronto — PT structure, full cedar finish

Jorge Morales
Posted by Jorge Morales

Toronto, ON

Stair building · Exterior carpentry · Finish carpentry · Framing

3

0

closets

closets

David Dow
Posted by David Dow
Carpenter
Cabinet

1

0

Port Colbourne ADU

Port Colbourne ADU

Vedro Drywall
Posted by Vedro Drywall
#ResidentialInsulation
Drywall Boarding

3

0

More from this crew

Other work by the people who built this

See all →