PROJECT

READY

Wet Vented Floor Drain Rough-In Installation

Posted February 5, 2026

Shanaya Krajacich

Built by Shanaya Krajacich

01 · ABOUT THIS PROJECT

This wet vented floor drain rough-in provides reliable drainage and code-compliant venting set into the gravel subbase before pouring concrete. I installed the underground drainage lines, cleanout access, and floor drain assembly, connecting the drainage system to the wet vent and fixture piping within the timber stud wall framing. Water supply lines and primer lines were routed through the framed walls to complete the underground and in-wall plumbing rough-in.

02 · PHOTOS
Project photo 1249
Project photo 1250

Created: Feb 5, 2026

03 · DISCUSSION

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

February 5, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Underground rough-in, school projects in building a 3pc washroom

Underground rough-in, school projects in building a 3pc washroom

Jonathan Ayoola
Posted by Jonathan Ayoola

Brampton, ON

Reading blueprints and construction drawings, Measuring and cutting materials accurately

3

0

New deck build and drawings

New deck build and drawings

William Golden
Posted by William Golden

Muskoka Lakes, ON

4

0

Wiring Simulation

Wiring Simulation

Posted by Dillon Wilson

Oakville, ON

2

0

wainscotting job

wainscotting job

Burlington, ON

Wainscoting

4

0

More from this crew

Other work by the people who built this

See all →