PROJECT
READYPosted February 5, 2026
Built by Shanaya Krajacich
Built by
Shanaya KrajacichThis wet vented floor drain rough-in provides reliable drainage and code-compliant venting set into the gravel subbase before pouring concrete. I installed the underground drainage lines, cleanout access, and floor drain assembly, connecting the drainage system to the wet vent and fixture piping within the timber stud wall framing. Water supply lines and primer lines were routed through the framed walls to complete the underground and in-wall plumbing rough-in.


Created: Feb 5, 2026
Please sign in to comment on projects
Status
Ready
Posted
February 5, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Underground rough-in, school projects in building a 3pc washroom
Brampton, ON
3
0
Other work by the people who built this