
Project Manager · Collingwood, ON
PMP® certified Construction Project Manager with over five years of experience delivering residential, commercial, and institutional projects from initiation through closeout. Strong background in coordinating trades, managing schedules, administering RFIs and change orders, and maintaining alignment with project scope, schedule, and delivery objectives. Experienced in both project execution and estimating, with the ability to support scope definition, identify project risks early, and maintain effective stakeholder communication throughout the project lifecycle. Known for a hands-on, solution-focused approach, strong organizational skills, and a commitment to delivering high-quality, well
PMP
MCAT Project Management Certification
Estimator
Project Manager
Project Manager
PMI Authorized PMP Exam Prep
Construction Management
3 projects
I led a mechanical upgrade project at a public school to improve heating performance, HVAC reliability, building controls, and overall comfort for students and staff. The project included upgrades to boilers, pumps, HVAC equipment, piping, valves, insulation, and BAS controls while maintaining safety and minimizing disruption in an active school environment. I managed the planning stage by working with school board representatives, facility staff, consultants, subcontractors, and controls specialists to define the scope, schedule, shutdown requirements, access restrictions, and project expectations. I developed the project plan, schedule, budget, procurement approach, risk register, and communication plan to keep the work organized and aligned with the approved scope. During construction, I managed the mechanical and controls work, including equipment removals, boiler and pump installation, piping modifications, HVAC upgrades, control wiring, BAS programming, start-up, and system integration. I also managed subcontractors, supplier deliveries, site issues, inspections, change impacts, and safety requirements to keep the project on track. I led closeout by verifying the completed work through inspections, testing, balancing, commissioning, and client walkthroughs. I managed final documentation, including as-builts, equipment manuals, controls verification records, warranty information, and deficiency closeout. The project improved heating reliability, HVAC performance, and building comfort while meeting the approved project requirements.
I led the mechanical and electrical system upgrade project at 6 Glamorgan Avenue for Toronto Community Housing. The project was part of a capital improvement initiative to modernize aging building infrastructure, improve system reliability, and complete the work safely within an occupied residential building. The project had to stay aligned with the approved scope, schedule, and budget while minimizing disruption to tenants and maintaining building operations. I led the planning stage by identifying key stakeholders, including Toronto Community Housing representatives, facility management, engineering consultants, subcontractors, technical specialists, and tenant representatives. I managed stakeholder engagement meetings to define the project objectives, scope boundaries, tenant impact considerations, project requirements, and success criteria. I also helped establish the project charter and moved the project into detailed planning once authorization was received. I led the development of the project management plan, including the scope, schedule, cost, quality, communications, procurement, risk, and stakeholder engagement plans. I created the WBS and WBS dictionary to break the mechanical, electrical, procurement, tenant coordination, testing, and closeout work into clear work packages. I developed the schedule baseline using activity sequencing, duration estimating, schedule network analysis, and critical path review. I also built the cost baseline using three-point estimating, subcontractor pricing, and cost aggregation based on the WBS. I identified project risks, documented them in the risk register, and reviewed probability and impact to prioritize the most important risks. For the mechanical and electrical upgrade work, I managed the contractors and technical specialists responsible for the system installations and related construction activities. I managed procurement by preparing bid documents, reviewing proposals, supporting vendor and subcontractor selection, negotiating scope details, and finalizing contracts. During construction, I managed project meetings, reviewed progress, tracked issues, reviewed upcoming work, and kept the project team aligned with the approved scope and schedule. Because the building remained occupied, I also managed construction sequencing, access requirements, communication with building representatives, and work planning to reduce disruption to tenants. Throughout the project, I monitored progress using schedule reviews, cost tracking, variance reviews, and performance reporting. I maintained the issue log, used root cause analysis to resolve problems, and updated the risk register as new risks or site conditions came up. I managed change control by reviewing the impact of proposed changes on scope, schedule, cost, quality, and tenant disruption before approvals were issued. I also managed quality control through inspections, system testing, deficiency reviews, and corrective actions to make sure the work met the project specifications. I led project closeout by verifying deliverables through inspections, measurement, testing, commissioning review, and client walkthroughs. I managed final documentation, including commissioning reports, as-built drawings, system manuals, deficiency closeout records, and project files. I also led lessons learned discussions and archived the project records for future reference. The project was completed within the approved schedule and delivered improved building system performance, reliability, and long-term operational value for the residential facility.
No posts yet
Roman hasn't posted anything yet.
Ask Chad
Beta