PROJECT
READYPosted April 18, 2026
Built by Signature Finish Renovations (Fozzie)
All of the work you see was completed by myself other than the electrical, plumbing rough-ins. There will be a stage 2 to this renovation installing a kitchen/wet bar to incorporate and hide the electrical panel. Demo, Framing/rebuild, Drywall, Drywall Taping, Tiling, Trim, Finishes and Painting. Was done by myself.






Created: Apr 18, 2026
Please sign in to comment on projects
Status
Ready
Posted
April 18, 2026
Crews credited
1
Likes
Comments
Other work on Projekt Network
Other work by the people who built this