PROJECT

READY

Bear point

Posted April 10, 2026

Oakridge Timber Co

Built by Oakridge Timber Co

01 · ABOUT THIS PROJECT

3x3 10x10 exterior siding and interior walls

SCOPE AND TRADES ON THIS BUILD
Timber Framing
Mass Timber
Timber Layout
02 · PHOTOS
Project photo 2348
Project photo 2349
Project photo 2350
Project photo 2351
Project photo 2352
Project photo 2353
Project photo 2354
Project photo 2355
Project photo 2356

Created: Apr 10, 2026

03 · DISCUSSION
Profile
Oakridge Timber CoApr 13, 2026

@Ian MacFayden we have done a few little tasks but our scope of work is for the heavy timber, framing was done by fuller framing

Profile
Michael HolmesApr 12, 2026

The attention to detail is impressive. Looks amazing.

Profile
Ian MacFaydenApr 12, 2026

This is so cool. There seems to be structure behind the Timbers? What’s the story there and were you involved with that as well or just the heavy timber work?

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

April 10, 2026

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Moose Deer Point Indigenous Gathering Space  (Sept 2024)

Moose Deer Point Indigenous Gathering Space (Sept 2024)

Jason Wilson
Posted by Jason Wilson
Timber Layout
Timber Framing
Joinery

8

3

Brightwater C4 building 2022

Brightwater C4 building 2022

Jason Wilson
Posted by Jason Wilson
Fabrication
Plan reading
Mass Timber

10

1

Bear Point 2025

Bear Point 2025

Jason Wilson
Posted by Jason Wilson
Timber Layout
Rough Carpentry
Siding

8

1

2026 Spring VMI FTX

2026 Spring VMI FTX

Holly Venter
Posted by Holly Venter
Timber Framing
Networking

8

5