PROJECT

READY

Concrete Foundation Forming and Pouring in Whitby

Posted December 4, 2025

S&P Group

Built by S&P Group

01 · ABOUT THIS PROJECT

Built by

S&P Group

S&P Group completed concrete foundation forming and pouring for this new construction project in Whitby. The complex concrete foundation layout features multi-level reinforced walls, stepped footings, and structural corners poured to precision. Formwork was systematically erected, poured, and stripped across the excavated residential building site to prepare for the framing and backfill stages.

02 · PHOTOS
Project photo 776

Created: Dec 4, 2025

03 · DISCUSSION
Profile
Forever Precious Tile & MarbleDec 9, 2025

👏👏

Profile
HummingbirdHill HomesDec 5, 2025

Wow look at that bad boy!

Please sign in to comment on projects

PROJECT FACTS

Status

Ready

Posted

December 4, 2025

Crews credited

1

Likes

Comments

More projects like this one

Other work on Projekt Network

See all →
Underground rough-in, school projects in building a 3pc washroom

Underground rough-in, school projects in building a 3pc washroom

Jonathan Ayoola
Posted by Jonathan Ayoola

Brampton, ON

Reading blueprints and construction drawings, Measuring and cutting materials accurately

3

0

New deck build and drawings

New deck build and drawings

William Golden
Posted by William Golden

Muskoka Lakes, ON

4

0

Wiring Simulation

Wiring Simulation

Posted by Dillon Wilson

Oakville, ON

2

0

wainscotting job

wainscotting job

Burlington, ON

Wainscoting

4

0